Get Building Plans
Council-Approved First Time.
Automated pre-submission regulatory review against SANS 10400 (Parts A to XA) and South African municipal bylaws. Eliminate months of council rejection delays, costly redraws, and municipal delay letters before you lodge your drawings.
Erf 412 Irene — Modern Residential Addition
Window W-04 on Lounge North Elevation has a sill height of 450 mm above finished floor level. Any glazing below 800 mm requires mandatory safety glazing. Ordinary float glass will trigger statutory council refusal.
The 110 mm underground soil pipe from the master en-suite turns 90° before connecting to the external sewer line without an inspection eye or rodding access point. City of Tshwane inspectors mandate rodding access at every bend exceeding 45°.
Tshwane Climatic Zone 1 requires ceiling thermal insulation total R-value of min 3.7 m²·K/W and 50% renewable hot water specification.
All habitable rooms satisfy the statutory 2,400 mm vertical height requirement (2,600 mm provided) and exceed the 6.0 m² minimum room area standard.
How Plan Comply Works
Three simple steps to transform an architectural draft into an approved municipal submission.
Upload Plan Drawings
Upload your complete architectural drawing set (floor plans, elevations, sections, site plan, drainage) in PDF or drawing image format. Select your target South African municipality and occupancy class.
150+ Point Regulatory Audit
Our compliance engine cross-checks room heights, window glazing safety zones, drainage falls, natural light and ventilation percentages, boundary building lines, and energy calculation tables against Act 103 of 1977.
Council-Ready Action Plan
Receive an actionable report detailing exact clause citations, rejection red flags, and concrete CAD drawing notes for your draughtsperson so your drawings pass municipal council scrutiny on the very first round.
Why Architectural Practices Use Plan Comply
Protect project schedules, developer capital, and your professional reputation by preventing municipal delay letters.
Eliminate 6-Month Council Stalls
When a municipal building control officer rejects a plan, your project enters a 30 to 60-day re-scrutiny queue. Pre-auditing avoids initial rejection entirely.
Prevent Redesign Costs
Catching a non-compliant stairway riser, boundary encroachment, or drainage run before council lodgement saves tens of thousands in structural rework.
Draughtsperson CAD Notes
No guesswork. Every non-compliance item includes copy-paste schedule notes and clause numbers your team can immediately apply in AutoCAD or Revit.
Client Trust & Authority
Deliver a certified Pre-Submission Audit Certificate to your property clients proving their building plans meet national South African building regulations.
Full SANS 10400 Audit Scope
Auditing every mandatory regulatory section enforced by South African municipal building examiners.
Stop Waiting Months on Council Delays.
Verify your architectural drawings today. Every new user receives 1 free plan compliance audit credit to test on any residential, commercial, or addition drawing.